1. |
Straighten tops as needed. |
2. |
Replace or tighten nuts and bolts as needed. |
3. |
Repair all interior shelves.
(Please advise us of any needing to be replaced.) |
4. |
Straighten and re-bolt end panels, or you may wish to replace ends with heavy duty panels. See Optional Equipment Specifications.
|
5. |
Bolt and tighten all door frame assemblies. |
6. |
Adjust all moving parts and lubricate. |
7. |
Repair or replace missing handles. |
8. |
Straighten all louvers. |
9. |
Adjust, or if missing, replace hinges. |
10. |
Replace missing number plates as required, or (on total refurbishment) install all new tags. |
11. |
Align and refasten lockers onto bases. |
12. |
Adjust door frame latch and replace if needed. |
13. |
Repair latch bars and fingers and replace as needed. |
14. |
Adjust and straighten all existing and new doors to operate freely without binding. |
(New parts will match existing parts when available.) |
| |
|